No
Yes
View More
View Less
Working...
Close
OK
Cancel
Confirm
System Message
Delete
My Schedule
An unknown error has occurred and your request could not be completed. Please contact support.
Scheduled
Scheduled
Wait Listed
Personal Calendar
Speaking
Conference Event
Meeting
Interest
There aren't any available sessions at this time.
Conflict Found
This session is already scheduled at another time. Would you like to...
Loading...
Please enter a maximum of {0} characters.
{0} remaining of {1} character maximum.
Please enter a maximum of {0} words.
{0} remaining of {1} word maximum.
must be 50 characters or less.
must be 40 characters or less.
Session Summary
We were unable to load the map image.
This has not yet been assigned to a map.
Search Catalog
Reply
Replies ()
Search
New Post
Microblog
Microblog Thread
Post Reply
Post
Your session timed out.
This web page is not optimized for viewing on a mobile device. Visit this site in a desktop browser to access the full set of features.
Emerson Exchange 2018
Add to My Interests
Remove from My Interests

2-162194 - Reducing Project Risk for PBF Energy – Toledo Refining Center Hydrocracking Unit SIS Upgrade

Session Speakers
Session Description

PBF Energy – Toledo Refining Center needed to add a new SIL3 Safety Instrumented Function (SIF) for low flow detection of hydrogen to their hydrocracker. The existing piping was a custom centrifugally cast nonstandard steel. There was no procedure to qualify welds that would be needed to add the low flow measurement to the existing pipe. Between the cost to replace all the existing piping, the downtime that would be incurred, and the risk to the project schedule an alternative solution was needed. Toledo Refining Center utilized a Rosemount 9295 Process Meter to reduce project risk and minimize the cost of piping improvements to facilitate the flow measurement.